Enter up to five sections of data for the Structure Values starting at Outside Temp 1 and Structure Btu's 1. Then enter up to five sections of data for the Equipment Values starting at Outside Temp 1 and Equipment Btu's 1. A minimum of two sections of data are needed for both Structure and Equipment values to find the balance point but the Structure and Equipment values do not have to have the same amount of data entries to work.